
Operator Qualifications
| We hold the following Operator Qualification (OQ) Requirements: | ||
| 1 | 102EMERG Emergency Plans & Public Contractor Education | |
| 2 | 107PIG Pipeline Pigging | |
| 3 | 205PCROS Pipeline Crossings | |
| 4 | 413UPRAT Up-Rating Pipeline Systems | |
| 5 | 400VOPER Valve Operators | |
| 6 | 411PURGE Pipeline Purging | |
| 7 | 404PPFUS Plastic Pipe Fusion | |
| 8 | 201PLPTR Population Density Change & Pipeline Patrol | |
| 9 | 403PTEST Pressure Testing Steel & Plastic Pipelines | |
| 10 | 416SHUT Pipeline Shutdown and Startup Planning | |
| 11 | 100ACCIG Prevention of Accidental Ignition & Potential Ignition Sources | |
| 12 | LQ300 LQ: Marking Pipelines - Temporary and Permanent | |
| 13 | 510ATMPO Atmospheric Corrosion - Pipeline Operation | |
| 14 | 421TIE Pipeline Tie-in Methods | |
| 15 | LQ2350 LQ: Aboveground Storage Tank Overfill Protection | |
| 16 | 206PFAIL Leak & Pipeline Failure Investigation | |
| 17 | 406MECH Mechanical Fittings | |
| 18 | 106EXCAV OSHA/DOT - Excavation Safety | |
| 19 | 103GAS Characteristics and Properties of Natural Gas | |
| 20 | 200LEAK Leak Survey and Leak Classification | |
| 21 | 105CGI CGIs and Flame Ionization Units | |
| 22 | 101ABNOR Recognize and React to Abnormal Operating Conditions & Safety Related Conditions | |
| 23 | 300DPREV Damage Prevention: Locating and Marking Pipeline | |
| 24 | 602WREPR Weld Repairs and Welding Procedures | |
| 25 | 503COAT Protective Coatings | |
| 26 | 409LEAK Pipeline Leak Repair | |
| 27 | 001OPERQ Operator Qualification Summary | |
| We are TxDOT pre-certified for Protected Species Habitat Determination. | ||








